
The first day was plagued with several technical
difficulties. Besides the requisite dozen trips to the hardware store, we quickly found that the $10 Harbor Freight air chisels (the only ones they had in stock) were good for about 30-60 minutes of work before blowing out. After going through 4 of them in 1 day, I ended up returning them and bought some decent Ingersol Rand chisels from Northern Tool - at $50 a pop! Still, it was worth it considering we would still be chiseling away if we didn't have them.

On Sunday afternoon, we finished the last bit of chiseling - a full hour before the rented compressor had to be returned! Then we spent the rest of the afternoon sweeping and vacuuming up all the debris, and finally hosed down everything to get rid of the dust. After 2 long weeks, all the prep work for the tile job was done, and we were finally ready to lay tile.




No comments:
Post a Comment